What suppliers sell at each stage of an Australian mining project
What a mining supplier can sell depends on where the project is. Selling explosives to a project still in feasibility is wasted effort; pitching an EPC contract after it has been awarded is too late. Here is the usual pattern, and where to find projects at each stage.
| Stage | What suppliers typically sell | Projects in our pipeline |
|---|---|---|
| Study | Drilling, environmental and approvals support; little construction spend yet | 24 |
| Approved, not funded | Relationship-building with the owner and likely EPC; spend starts after funding | 12 |
| Funded, FID taken | EPC and EPCM, long-lead equipment, mining contractor and camp tenders | 40 (these three stages) |
| Under construction | Civil, structural, mechanical, electrical, power, fuel, camps and labour; operating-phase supply contracts | |
| Commissioning / ramp-up | Commissioning support, spares, reagents, consumables, operating crews | |
| Restart planned | Refurbishment, dewatering, recruitment, mining and processing contracts | 7 |
| On hold / withdrawn | Watch only: little spend until a restart or sale decision | 14 |
This is a general guide for each stage, not a statement about any one project. The projects at each stage change quickly, and the stage of each is dated, so check the as-at date before you approach.
Where the work packages are posted
Projects that need an Australian Industry Participation Plan publish a summary on industry.gov.au that usually names the work packages and contractors. Industry Capability Network (ICN) Gateway lists many projects for suppliers to register interest. State resources regulators publish approvals and environmental documents for most projects.
Browse the pipeline by state, commodity or stage on the pipeline hub, or see every project on the free map preview.
Development & Restart Pipeline: 453 projects with stage, target first production, capital cost, named contractors, approvals and funding, each with a source link and as-at date, plus an interactive map. A$299.
Or the bundle with the Verified Edition (who owns 346 mine sites) and a company view: A$449. One-time purchase.
See pricingFree 10-row sampleFree map preview